Triple

T5164068
Position Surface form Disambiguated ID Type / Status
Subject Irondale rail yard E116506 entity
Predicate instanceOf P0 FINISHED
Object freight rail facility C14797 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: freight rail facility
Context triple: [Irondale rail yard, instanceOf, freight rail facility]
  • A. freight railroad
    A freight railroad is a rail transport system dedicated to moving goods and commodities—such as raw materials, manufactured products, and containers—using freight trains over a network of tracks.
  • B. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • C. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • D. railroad depot chosen
    A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
  • E. freight railroad company
    A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd445edb3881909b93b34d260717fc completed March 20, 2026, 12:58 p.m.
Created at: March 20, 2026, 1:44 p.m.