Triple

T5147737
Position Surface form Disambiguated ID Type / Status
Subject Fender Mike Dirnt Precision Bass E116114 entity
Predicate finishOptions P61829 FINISHED
Object 2-Color Sunburst LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2-Color Sunburst | Statement: [Fender Mike Dirnt Precision Bass, finishOptions, 2-Color Sunburst]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finishOptions
Context triple: [Fender Mike Dirnt Precision Bass, finishOptions, 2-Color Sunburst]
  • A. finished
    Indicates that an entity has completed an action, process, or state, reaching its end point.
  • B. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • C. finishPosition
    Indicates the final rank or place an entity achieves in an ordered outcome, such as a race, competition, or sequence of results.
  • D. startFinishType
    Indicates the specific way in which an activity, event, or process begins and/or ends (e.g., its initiation and completion characteristics).
  • E. finalOperations
    Indicates that an entity is involved in the last or concluding set of actions or processes within a sequence or workflow.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4446c0e08190a7c29dc74976bf03 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd78d7f4d081908d59adcd86f52f1d completed March 20, 2026, 4:42 p.m.
PD Predicate disambiguation batch_69bd77ae2f10819098bb8939106e1281 completed March 20, 2026, 4:37 p.m.
PDg Predicate description generation batch_69bd78d6a1388190804dcf568ca92129 completed March 20, 2026, 4:41 p.m.
Created at: March 20, 2026, 1:43 p.m.