Triple

T5128340
Position Surface form Disambiguated ID Type / Status
Subject Harry Potter E115634 entity
Predicate triwizardTaskStatus P54268 FINISHED
Object co-winner with Cedric Diggory LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: co-winner with Cedric Diggory | Statement: [Harry Potter, triwizardTaskStatus, co-winner with Cedric Diggory]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: triwizardTaskStatus
Context triple: [Harry Potter, triwizardTaskStatus, co-winner with Cedric Diggory]
  • A. tourStatus
    Indicates the current state or phase of a tour within its overall lifecycle (e.g., planned, active, completed, or canceled).
  • B. trainingStatus
    Indicates the current state or phase of an entity within a training or learning process.
  • C. statusOfObjectivesResolution
    Indicates the relationship that specifies how and to what extent defined objectives have been resolved or achieved.
  • D. participantStatus chosen
    Indicates the role, condition, or level of involvement that a participant has within a specific event, process, or relationship.
  • E. scriptoriumStatus
    Indicates the current operational or functional state of a scriptorium within a given context.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd444426bc819099ccd23f141e22aa completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd7d5a23908190a24e79d1b29d6fcf completed March 20, 2026, 5:01 p.m.
PD Predicate disambiguation batch_69bd77aa68b88190a50dd736a72d2901 completed March 20, 2026, 4:36 p.m.
Created at: March 20, 2026, 1:42 p.m.