Triple

T5127422
Position Surface form Disambiguated ID Type / Status
Subject U.S. intercity passenger rail network E115617 entity
Predicate instanceOf P0 FINISHED
Object transportation infrastructure system C3584 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation infrastructure system
Context triple: [U.S. intercity passenger rail network, instanceOf, transportation infrastructure system]
  • A. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • C. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • D. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • E. rail transportation infrastructure chosen
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd444426bc819099ccd23f141e22aa completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:42 p.m.