Triple
T5106669
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cais do Sodré |
E115111
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Cascais line |
E309970
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cascais line | Statement: [Cais do Sodré, connectsTo, Cascais line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Cascais line Context triple: [Cais do Sodré, connectsTo, Cascais line]
-
A.
Linha de Cascais
chosen
Linha de Cascais is a coastal suburban railway line in the Lisbon metropolitan area of Portugal, connecting central Lisbon to the seaside town of Cascais.
-
B.
Algarve line
The Algarve line is a major railway route in southern Portugal that connects the region’s coastal towns and cities along the Algarve.
-
C.
Linha de Sintra
Linha de Sintra is a heavily used suburban railway line serving commuter traffic between Lisbon and the Sintra region in Portugal.
-
D.
Lisbon–Porto main line
The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
-
E.
Linha de Aveiro
Linha de Aveiro is a suburban railway line in northern Portugal that connects Porto with the coastal city of Aveiro as part of the Porto urban rail network.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4440b3348190be1251fd8b7951f1 |
completed | March 20, 2026, 12:57 p.m. |
| NER | Named-entity recognition | batch_69bd75a7c6748190b02b7c2b617c830f |
completed | March 20, 2026, 4:28 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69beba9a19d881909f26b327273a95f1 |
completed | March 21, 2026, 3:34 p.m. |
Created at: March 20, 2026, 1:41 p.m.