Triple

T5106669
Position Surface form Disambiguated ID Type / Status
Subject Cais do Sodré E115111 entity
Predicate connectsTo P845 FINISHED
Object Cascais line E309970 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cascais line | Statement: [Cais do Sodré, connectsTo, Cascais line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cascais line
Context triple: [Cais do Sodré, connectsTo, Cascais line]
  • A. Linha de Cascais chosen
    Linha de Cascais is a coastal suburban railway line in the Lisbon metropolitan area of Portugal, connecting central Lisbon to the seaside town of Cascais.
  • B. Algarve line
    The Algarve line is a major railway route in southern Portugal that connects the region’s coastal towns and cities along the Algarve.
  • C. Linha de Sintra
    Linha de Sintra is a heavily used suburban railway line serving commuter traffic between Lisbon and the Sintra region in Portugal.
  • D. Lisbon–Porto main line
    The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
  • E. Linha de Aveiro
    Linha de Aveiro is a suburban railway line in northern Portugal that connects Porto with the coastal city of Aveiro as part of the Porto urban rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4440b3348190be1251fd8b7951f1 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd75a7c6748190b02b7c2b617c830f completed March 20, 2026, 4:28 p.m.
NED1 Entity disambiguation (via context triple) batch_69beba9a19d881909f26b327273a95f1 completed March 21, 2026, 3:34 p.m.
Created at: March 20, 2026, 1:41 p.m.