Triple
T5100926
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CoreMotion |
E114978
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | iOS framework |
C12867
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: iOS framework Context triple: [CoreMotion, instanceOf, iOS framework]
-
A.
mobile software framework
chosen
A mobile software framework is a reusable set of libraries, tools, and APIs that provides a structured foundation for building, deploying, and maintaining applications on mobile operating systems.
-
B.
UI framework
A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
-
C.
cross-platform UI framework
A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
-
D.
Mac OS X feature
A Mac OS X feature is a distinct capability or tool integrated into the Mac operating system that enhances user experience, productivity, or system functionality.
-
E.
cross-platform development framework
A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd443fc49c819089629c00e311310c |
completed | March 20, 2026, 12:57 p.m. |
Created at: March 20, 2026, 1:40 p.m.