Triple

T5084749
Position Surface form Disambiguated ID Type / Status
Subject Park Drive loop road E114608 entity
Predicate instanceOf P0 FINISHED
Object roadway C3254 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd443e941881908eb4e8c685b6f656 completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:40 p.m.