Triple

T5075772
Position Surface form Disambiguated ID Type / Status
Subject Singrauli E114391 entity
Predicate instanceOf P0 FINISHED
Object energy hub C17495 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: energy hub
Context triple: [Singrauli, instanceOf, energy hub]
  • A. energy agency
    An energy agency is an organization responsible for planning, regulating, and promoting the efficient, reliable, and sustainable production, distribution, and use of energy resources within a specific region or sector.
  • B. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. energy ministry
    The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
  • D. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • E. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd443dbf908190a9401e9c2dc7bd7d completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:39 p.m.