Triple
T5075772
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Singrauli |
E114391
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | energy hub |
C17495
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: energy hub Context triple: [Singrauli, instanceOf, energy hub]
-
A.
energy agency
An energy agency is an organization responsible for planning, regulating, and promoting the efficient, reliable, and sustainable production, distribution, and use of energy resources within a specific region or sector.
-
B.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
energy ministry
The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd443dbf908190a9401e9c2dc7bd7d |
completed | March 20, 2026, 12:57 p.m. |
Created at: March 20, 2026, 1:39 p.m.