Triple

T5031010
Position Surface form Disambiguated ID Type / Status
Subject Bruckner symphony cycle with the Gewandhausorchester Leipzig E113301 entity
Predicate instanceOf P0 FINISHED
Object recording project C11200 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: recording project
Context triple: [Bruckner symphony cycle with the Gewandhausorchester Leipzig, instanceOf, recording project]
  • A. record production project chosen
    A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
  • B. multimedia project
    A multimedia project is an integrated work that combines multiple forms of media—such as text, images, audio, video, and interactive elements—to communicate information or create an engaging experience.
  • C. recording studio
    A recording studio is a specialized facility equipped with acoustic treatment, audio hardware, and software where sound is captured, edited, and produced for music, voice, and other audio projects.
  • D. record producer
    A record producer is a music industry professional who oversees and manages the recording process, shaping the sound, arrangement, and overall artistic direction of a song or album.
  • E. collaborative project
    A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd443775e48190a646ffbfc4334723 completed March 20, 2026, 12:57 p.m.
Created at: March 20, 2026, 1:36 p.m.