Triple

T5028761
Position Surface form Disambiguated ID Type / Status
Subject West Jersey and Seashore Railroad E113242 entity
Predicate electrificationUsedFor P60611 FINISHED
Object multiple‑unit passenger trains LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: multiple‑unit passenger trains | Statement: [West Jersey and Seashore Railroad, electrificationUsedFor, multiple‑unit passenger trains]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationUsedFor
Context triple: [West Jersey and Seashore Railroad, electrificationUsedFor, multiple‑unit passenger trains]
  • A. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • B. electrificationUsedBetween
    Indicates that an electrification system or method is applied or present along the segment or connection between two entities.
  • C. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • D. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • E. electrificationCoverage
    Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd443775e48190a646ffbfc4334723 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd738f2cc88190a03eebf19e407411 completed March 20, 2026, 4:19 p.m.
PD Predicate disambiguation batch_69bd71509e9c8190a60c1d8d04936a12 completed March 20, 2026, 4:09 p.m.
PDg Predicate description generation batch_69bd724ff2b4819091351cf80d3647a1 completed March 20, 2026, 4:14 p.m.
Created at: March 20, 2026, 1:36 p.m.