Triple

T498967
Position Surface form Disambiguated ID Type / Status
Subject HMNB Portsmouth E10356 entity
Predicate sisterBase P14414 FINISHED
Object HMNB Clyde E11866 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: HMNB Clyde | Statement: [HMNB Portsmouth, sisterBase, HMNB Clyde]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: HMNB Clyde
Context triple: [HMNB Portsmouth, sisterBase, HMNB Clyde]
  • A. HMNB Clyde chosen
    HMNB Clyde is a major Royal Navy base in Scotland that serves as the home of the United Kingdom’s nuclear-armed submarine fleet.
  • B. HMNB Portsmouth
    HMNB Portsmouth is one of the United Kingdom’s main naval bases, serving as a key operational and support hub for the Royal Navy’s surface fleet on the south coast of England.
  • C. HMNB Devonport
    HMNB Devonport is a major Royal Navy dockyard and naval base in Plymouth, England, and the largest naval base in Western Europe.
  • D. RNAS Scapa Flow
    RNAS Scapa Flow was a key First World War seaplane and airship station in the Orkney Islands that supported the Royal Navy’s Grand Fleet operations from the major anchorage at Scapa Flow.
  • E. RNAS Dunkirk
    RNAS Dunkirk was a key Royal Naval Air Service seaplane and airship base in northern France during World War I, used primarily for anti-submarine patrols and coastal defense operations in the English Channel.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e847df8481909239ec08ccf1e376 completed Feb. 28, 2026, 1:06 p.m.
NER Named-entity recognition batch_69a2f119b14c8190a5a6b119579c2682 completed Feb. 28, 2026, 1:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69a48543f1948190b710628bf53cdf01 completed March 1, 2026, 6:28 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.