Triple

T4986706
Position Surface form Disambiguated ID Type / Status
Subject ÖBB E112020 entity
Predicate subsidiary P258 FINISHED
Object ÖBB-Infrastruktur AG E112020 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ÖBB-Infrastruktur AG | Statement: [ÖBB, subsidiary, ÖBB-Infrastruktur AG]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ÖBB-Infrastruktur AG
Context triple: [ÖBB, subsidiary, ÖBB-Infrastruktur AG]
  • A. ÖBB chosen
    ÖBB is Austria’s national railway company, operating most of the country’s passenger and freight train services across domestic and international routes.
  • B. Deutsche Bahn
    Deutsche Bahn is Germany's state-owned national railway company and one of the largest rail and logistics operators in Europe.
  • C. Stadler Rail
    Stadler Rail is a Swiss manufacturer of railway rolling stock known for producing regional and commuter trains, trams, and light rail vehicles for markets worldwide.
  • D. SBB Cargo
    SBB Cargo is the freight transport division of Switzerland’s national railway company, providing rail logistics and cargo services across Switzerland and into neighboring countries.
  • E. Swiss Federal Railways
    Swiss Federal Railways is Switzerland’s national railway company, responsible for operating the majority of the country’s passenger and freight rail services and managing much of its rail infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd441be7bc8190b530362d427b97d2 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd727c25bc8190b72f6ddd3772c80a completed March 20, 2026, 4:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69beba546a1081909fe082663ad5e238 completed March 21, 2026, 3:33 p.m.
Created at: March 20, 2026, 1:34 p.m.