Triple
T4973942
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North Dock |
E111719
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former commercial dock |
C16030
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former commercial dock Context triple: [North Dock, instanceOf, former commercial dock]
-
A.
former naval base
A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
-
B.
former port facility
chosen
A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
-
C.
historic wharf
A historic wharf is a preserved waterfront structure once used for docking, loading, and unloading ships, now valued for its cultural, architectural, and maritime heritage significance.
-
D.
dry dock
A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
-
E.
former whaling station
A former whaling station is a decommissioned coastal facility once used for hunting, processing, and exporting whales, now typically abandoned, repurposed, or preserved as a historical site.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd441a0eb481908050fa4273b19eae |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:33 p.m.