Triple
T495757
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | State Water Project |
E10289
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object |
Hyatt Powerplant
Hyatt Powerplant is a major hydroelectric generating facility in California that harnesses water from Lake Oroville as part of the State Water Project’s power and water delivery system.
|
E62294
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hyatt Powerplant | Statement: [State Water Project, hasComponent, Hyatt Powerplant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hyatt Powerplant Context triple: [State Water Project, hasComponent, Hyatt Powerplant]
-
A.
Jones Pumping Plant
Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
-
B.
Tracy Pumping Plant
Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
-
C.
Devil Canyon Powerplant
Devil Canyon Powerplant is a hydroelectric generating facility in Southern California that produces power as part of the State Water Project’s water conveyance and energy system.
-
D.
Hope Creek Nuclear Generating Station
Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
-
E.
Cascades Station
Cascades Station is a light rail stop on Portland’s MAX Red Line serving the Cascade Station shopping and business district near Portland International Airport.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Hyatt Powerplant Triple: [State Water Project, hasComponent, Hyatt Powerplant]
Generated description
Hyatt Powerplant is a major hydroelectric generating facility in California that harnesses water from Lake Oroville as part of the State Water Project’s power and water delivery system.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hyatt Powerplant Target entity description: Hyatt Powerplant is a major hydroelectric generating facility in California that harnesses water from Lake Oroville as part of the State Water Project’s power and water delivery system.
-
A.
Jones Pumping Plant
Jones Pumping Plant is a major water pumping facility in California’s Central Valley that lifts and conveys water from the Sacramento-San Joaquin Delta into the Central Valley Project’s distribution system.
-
B.
Tracy Pumping Plant
Tracy Pumping Plant is a major water pumping facility in California that lifts and conveys water from the Sacramento–San Joaquin Delta into the Central Valley Project’s distribution system.
-
C.
Devil Canyon Powerplant
Devil Canyon Powerplant is a hydroelectric generating facility in Southern California that produces power as part of the State Water Project’s water conveyance and energy system.
-
D.
Hope Creek Nuclear Generating Station
Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
-
E.
Cascades Station
Cascades Station is a light rail stop on Portland’s MAX Red Line serving the Cascade Station shopping and business district near Portland International Airport.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e847df8481909239ec08ccf1e376 |
completed | Feb. 28, 2026, 1:06 p.m. |
| NER | Named-entity recognition | batch_69a2f115334881908ac5ab96c7f4214e |
completed | Feb. 28, 2026, 1:43 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a485425ef88190b5b3298a853c8b1a |
completed | March 1, 2026, 6:28 p.m. |
| NEDg | Description generation | batch_69a4859c4f788190ade594f841f436b1 |
completed | March 1, 2026, 6:29 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69a485e9cd9481908a4961b2c1fb435a |
completed | March 1, 2026, 6:31 p.m. |
Created at: Feb. 28, 2026, 1:12 p.m.