Triple

T4952196
Position Surface form Disambiguated ID Type / Status
Subject Great Green Wall E111193 entity
Predicate instanceOf P0 FINISHED
Object climate change adaptation project C2060 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: climate change adaptation project
Context triple: [Great Green Wall, instanceOf, climate change adaptation project]
  • A. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • B. geohazards risk reduction program
    A geohazards risk reduction program is a coordinated set of policies, practices, and interventions designed to identify, assess, and mitigate risks from geological hazards such as earthquakes, landslides, and volcanic eruptions to protect people, infrastructure, and the environment.
  • C. environmental programme chosen
    An environmental programme is an organized set of coordinated activities, policies, and initiatives designed to protect, manage, or improve the natural environment and promote sustainable practices.
  • D. climate change book
    A climate change book is a written work that explains the causes, impacts, and potential solutions to global climate change, often combining scientific evidence with policy, economic, and social perspectives.
  • E. disaster management initiative
    A disaster management initiative is a coordinated program or effort designed to prevent, prepare for, respond to, and recover from natural or human-made disasters to protect lives, property, and the environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4418390c8190b7e9766a2512ce55 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:31 p.m.