Triple
T4942662
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IEC 60000 series |
E110974
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | family of international standards |
C1803
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: family of international standards Context triple: [IEC 60000 series, instanceOf, family of international standards]
-
A.
organ of the International Organization for Standardization
An organ of the International Organization for Standardization is a formal structural body within ISO, such as a council, committee, or technical group, that is responsible for specific governance, coordination, or standardization functions.
-
B.
ISO/IEC standard
An ISO/IEC standard is a formally agreed-upon specification developed jointly by the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC) that defines common requirements, guidelines, or characteristics for products, services, or systems to ensure quality, safety, interoperability, and consistency across international markets.
-
C.
international standard
chosen
An international standard is an agreed-upon set of rules, guidelines, or specifications established by recognized global bodies to ensure compatibility, safety, and quality across countries and industries.
-
D.
standards-setting organization
A standards-setting organization is an entity that develops, maintains, and promotes agreed-upon technical, professional, or procedural norms to ensure compatibility, quality, and interoperability across industries or sectors.
-
E.
IEC standard
An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4415eee08190bdce70276e56a5b4 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:31 p.m.