Triple

T4936426
Position Surface form Disambiguated ID Type / Status
Subject Vishvamitra E110821 entity
Predicate attainedStatus P38040 FINISHED
Object Brahmin through tapas LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brahmin through tapas | Statement: [Vishvamitra, attainedStatus, Brahmin through tapas]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: attainedStatus
Context triple: [Vishvamitra, attainedStatus, Brahmin through tapas]
  • A. achievementStatus
    Indicates the current state or level of completion of an achievement-related goal or milestone for an entity.
  • B. obtainedStatus chosen
    Indicates that an entity has received or achieved a particular status or condition as a result of some process or event.
  • C. statusGrantedOn
    Indicates the date or time at which a particular status was officially conferred or became effective for an entity.
  • D. awardedStatus
    Indicates that a particular status, honor, or designation has been formally granted to an entity.
  • E. status
    Indicates the current condition, state, or standing of an entity within a given context.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4415eee08190bdce70276e56a5b4 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd7085b1dc819099408f6503f0210f completed March 20, 2026, 4:06 p.m.
PD Predicate disambiguation batch_69bd6c389b9881908ad7fb1c5393c1b1 completed March 20, 2026, 3:48 p.m.
Created at: March 20, 2026, 1:30 p.m.