Triple
T4927805
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Saab Active Head Restraints (later models) |
E110619
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | automotive safety system |
C17476
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: automotive safety system Context triple: [Saab Active Head Restraints (later models), instanceOf, automotive safety system]
-
A.
advanced driver-assistance system
An advanced driver-assistance system is an integrated set of vehicle technologies that monitor the driving environment and vehicle status to assist the driver in controlling the car, enhancing safety, comfort, and efficiency.
-
B.
automotive suspension system
An automotive suspension system is the integrated assembly of springs, dampers, linkages, and related components that connects a vehicle’s body to its wheels to control ride comfort, handling, and road shock isolation.
-
C.
intelligent transportation system component
An intelligent transportation system component is a hardware or software element that collects, processes, or communicates transportation-related data to optimize traffic flow, enhance safety, and improve overall system efficiency.
-
D.
adaptive suspension system
An adaptive suspension system is a vehicle suspension technology that continuously adjusts damping and stiffness in real time based on driving conditions, road surface, and driver inputs to optimize comfort, handling, and stability.
-
E.
automotive platform
An automotive platform is a shared, standardized set of structural, mechanical, and electronic components that underpins multiple vehicle models to streamline development, reduce costs, and enable design flexibility.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4415190c8190817bee7ec9f9f944 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:30 p.m.