Triple

T4925841
Position Surface form Disambiguated ID Type / Status
Subject Aberthaw Power Station site E110572 entity
Predicate redevelopmentGoal P20590 FINISHED
Object economic regeneration of the area LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: economic regeneration of the area | Statement: [Aberthaw Power Station site, redevelopmentGoal, economic regeneration of the area]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: redevelopmentGoal
Context triple: [Aberthaw Power Station site, redevelopmentGoal, economic regeneration of the area]
  • A. redevelopmentFor
    Indicates a relationship where one entity is intended, designated, or used for the redevelopment of another entity.
  • B. redevelopmentProject
    Indicates a project involving the renewal, improvement, or transformation of an existing area, structure, or infrastructure, typically replacing or upgrading what was previously there.
  • C. aimsToDevelop chosen
    Indicates an entity’s intention or effort to create, improve, or bring about another entity, outcome, or capability.
  • D. redevelopmentLedBy
    Indicates that a redevelopment process or project is directed, managed, or overseen by a particular agent or entity.
  • E. redevelopmentEnd
    Indicates the point in time or event at which a redevelopment process or project is considered completed or ceases.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4413f9908190afcff44d7929cc4c completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd7033c430819088e62f14979aa83c completed March 20, 2026, 4:05 p.m.
PD Predicate disambiguation batch_69bd6c3695c8819094e7ad2f6d4ba1ac completed March 20, 2026, 3:48 p.m.
Created at: March 20, 2026, 1:30 p.m.