Triple

T4925830
Position Surface form Disambiguated ID Type / Status
Subject Aberthaw Power Station site E110572 entity
Predicate formerOwner P347 FINISHED
Object RWE E226682 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RWE | Statement: [Aberthaw Power Station site, formerOwner, RWE]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RWE
Context triple: [Aberthaw Power Station site, formerOwner, RWE]
  • A. RWE chosen
    RWE is a major German energy company that operates internationally, with significant investments in renewable power generation such as large offshore wind farms.
  • B. E.ON
    E.ON is a major European energy company based in Germany that focuses on electricity generation, renewable energy, and energy infrastructure services.
  • C. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • D. EDF Renewables
    EDF Renewables is a global renewable energy company specializing in the development, construction, and operation of wind, solar, and energy storage projects.
  • E. Centrica
    Centrica is a British multinational energy and services company best known as the owner of British Gas and a major supplier of gas and electricity in the UK and Ireland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4413f9908190afcff44d7929cc4c completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd7033c430819088e62f14979aa83c completed March 20, 2026, 4:05 p.m.
NED1 Entity disambiguation (via context triple) batch_69be81c2cb288190b0a603992c08235c completed March 21, 2026, 11:32 a.m.
Created at: March 20, 2026, 1:30 p.m.