Triple
T4925818
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aberthaw Power Station site |
E110572
|
entity |
| Predicate | operatorOfFormerPlant |
P31764
|
FINISHED |
| Object | RWE Generation UK |
E226682
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RWE Generation UK | Statement: [Aberthaw Power Station site, operatorOfFormerPlant, RWE Generation UK]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: RWE Generation UK Context triple: [Aberthaw Power Station site, operatorOfFormerPlant, RWE Generation UK]
-
A.
RWE
chosen
RWE is a major German energy company that operates internationally, with significant investments in renewable power generation such as large offshore wind farms.
-
B.
Centrica
Centrica is a British multinational energy and services company best known as the owner of British Gas and a major supplier of gas and electricity in the UK and Ireland.
-
C.
EDF Renewables
EDF Renewables is a global renewable energy company specializing in the development, construction, and operation of wind, solar, and energy storage projects.
-
D.
Ørsted
Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
-
E.
E.ON
E.ON is a major European energy company based in Germany that focuses on electricity generation, renewable energy, and energy infrastructure services.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: operatorOfFormerPlant Context triple: [Aberthaw Power Station site, operatorOfFormerPlant, RWE Generation UK]
-
A.
formerOperates
chosen
Indicates that an entity previously operated or managed another entity but no longer does so.
-
B.
operatorPlanned
Indicates that an operator has scheduled or arranged a specific action, process, or operation to occur.
-
C.
formerProduct
Indicates that an entity was previously a product of another entity but is no longer in that role or status.
-
D.
operatedBefore
Indicates that one entity performed an operation or action at an earlier time than another entity.
-
E.
formerManufacturer
Indicates that an entity previously manufactured another entity but no longer does so.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4413f9908190afcff44d7929cc4c |
completed | March 20, 2026, 12:56 p.m. |
| NER | Named-entity recognition | batch_69bd7033c430819088e62f14979aa83c |
completed | March 20, 2026, 4:05 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69be77a9dff481908c7f525f233d9bce |
completed | March 21, 2026, 10:49 a.m. |
| PD | Predicate disambiguation | batch_69bd6c3695c8819094e7ad2f6d4ba1ac |
completed | March 20, 2026, 3:48 p.m. |
Created at: March 20, 2026, 1:30 p.m.