Triple

T492139
Position Surface form Disambiguated ID Type / Status
Subject LC2 armchair E10211 entity
Predicate instanceOf P0 FINISHED
Object modernist furniture C2405 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: modernist furniture
Context triple: [LC2 armchair, instanceOf, modernist furniture]
  • A. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • B. architectural style
    An architectural style is a distinctive set of design principles, forms, materials, and decorative elements that characterize the built works of a particular period, region, culture, or movement.
  • C. public sculpture
    A public sculpture is a three-dimensional artwork installed in outdoor or communal spaces, intended for public viewing and interaction, often reflecting cultural, historical, or social themes.
  • D. art museum
    An art museum is a public or private institution that collects, preserves, studies, and exhibits works of art for education, inspiration, and cultural enrichment.
  • E. moveable feast
    A moveable feast is a joyful, often recurring celebration or experience that can be enjoyed in different places and times, carrying its spirit with you wherever you go.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e847df8481909239ec08ccf1e376 completed Feb. 28, 2026, 1:06 p.m.
Created at: Feb. 28, 2026, 1:12 p.m.