Triple

T4916326
Position Surface form Disambiguated ID Type / Status
Subject Geordie Greig E110357 entity
Predicate hasActivityEnd P17625 FINISHED
Object 21st century (ongoing) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 21st century (ongoing) | Statement: [Geordie Greig, hasActivityEnd, 21st century (ongoing)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasActivityEnd
Context triple: [Geordie Greig, hasActivityEnd, 21st century (ongoing)]
  • A. hasActivityStatus
    Indicates the current state or condition of an activity, such as whether it is planned, ongoing, completed, or cancelled.
  • B. hasActivityIn
    Indicates that an entity engages in or performs a particular activity within a specified context, location, or domain.
  • C. endOfActivity chosen
    Indicates that a particular activity has reached its completion or final point in time.
  • D. hasEnd
    Indicates that one entity serves as the terminal point, boundary, or conclusion of another entity or process.
  • E. hasInteractiveActivity
    Indicates that an entity includes or is associated with an activity that requires active user participation or engagement.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd44132b94819088522d92beaadc78 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6fa559608190aa8d02b1547b8f97 completed March 20, 2026, 4:02 p.m.
PD Predicate disambiguation batch_69bd6c3421588190ab08e92b9558042e completed March 20, 2026, 3:48 p.m.
Created at: March 20, 2026, 1:29 p.m.