Triple

T4908415
Position Surface form Disambiguated ID Type / Status
Subject Birmingham Zoo E109969 entity
Predicate near P350 FINISHED
Object U.S. Highway 280 E54415 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Highway 280 | Statement: [Birmingham Zoo, near, U.S. Highway 280]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Highway 280
Context triple: [Birmingham Zoo, near, U.S. Highway 280]
  • A. U.S. Route 280 chosen
    U.S. Route 280 is a major east–west U.S. Highway running from central Alabama through Georgia, connecting cities such as Birmingham, Columbus, and Savannah.
  • B. U.S. Route 81
    U.S. Route 81 is a major north–south United States highway running from Texas to the Canadian border, historically following much of the old Meridian Highway route.
  • C. U.S. Route 380
    U.S. Route 380 is an east–west U.S. highway that runs through New Mexico and Texas, connecting rural communities and regional centers across the southern Great Plains.
  • D. U.S. Route 281
    U.S. Route 281 is a major north–south United States highway that runs from the Mexican border in Texas to the Canadian border in North Dakota, passing through several central states.
  • E. U.S. Route 287
    U.S. Route 287 is a major north–south U.S. Highway running from the Gulf Coast of Texas through the Great Plains and Rocky Mountain states to Montana, serving as an important regional freight and travel corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd441180708190ba42ffb44fea533a completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6e765094819099481f4f2dd7c47d completed March 20, 2026, 3:57 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8de86454081909232f45fa7d48976 completed March 29, 2026, 8:10 a.m.
Created at: March 20, 2026, 1:29 p.m.