Triple

T4848506
Position Surface form Disambiguated ID Type / Status
Subject Bridge of Peace E108352 entity
Predicate instanceOf P0 FINISHED
Object bow-shaped bridge C7122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bow-shaped bridge
Context triple: [Bridge of Peace, instanceOf, bow-shaped bridge]
  • A. beam bridge
    A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
  • B. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • C. cantilever bridge
    A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
  • D. brick arch bridge
    A brick arch bridge is a structure composed of one or more curved brick arches that span an obstacle, using the compressive strength of masonry to transfer loads safely to its supports.
  • E. ornamental bridge chosen
    An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4409b264819085ab855f3eb5381a completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:25 p.m.