Triple
T4845035
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LEED v4 |
E108267
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | LEED rating system |
C5961
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: LEED rating system Context triple: [LEED v4, instanceOf, LEED rating system]
-
A.
green building certification system
chosen
A green building certification system is a standardized framework that evaluates and rates buildings based on their environmental performance, resource efficiency, and sustainability practices throughout design, construction, and operation.
-
B.
green building certification level
A green building certification level represents the degree to which a building meets defined sustainability and environmental performance standards set by a recognized rating system.
-
C.
building technology evaluation program
A building technology evaluation program is a structured process or system for assessing the performance, cost-effectiveness, sustainability, and regulatory compliance of building-related technologies in real or simulated conditions.
-
D.
sustainability certification label
A sustainability certification label is a standardized mark or symbol on products or services indicating they meet defined environmental, social, and/or ethical performance criteria verified by an independent body.
-
E.
sustainability certification body
An organization that develops, manages, and enforces standards to assess and certify the environmental, social, and economic sustainability performance of products, services, or entities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4409b264819085ab855f3eb5381a |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:25 p.m.