Triple

T4845029
Position Surface form Disambiguated ID Type / Status
Subject LEED for New Construction E108266 entity
Predicate targetsPhase P59737 FINISHED
Object design phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: design phase | Statement: [LEED for New Construction, targetsPhase, design phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: targetsPhase
Context triple: [LEED for New Construction, targetsPhase, design phase]
  • A. campaignPhase
    Indicates the specific stage or period within the lifecycle of a campaign in which an entity or activity currently occurs.
  • B. goalStage
    Indicates the specific phase or step a goal is currently in within its overall progression or lifecycle.
  • C. target
    Indicates that one entity is the intended object, goal, or focus of another entity’s action or attention.
  • D. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • E. phasesOut
    Indicates the process by which one entity or condition is gradually discontinued or removed in favor of another over time.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd4409b264819085ab855f3eb5381a completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6e01872c81909607010c10538ad1 completed March 20, 2026, 3:55 p.m.
PD Predicate disambiguation batch_69bd6c2375a4819098e16acb982c8fab completed March 20, 2026, 3:47 p.m.
PDg Predicate description generation batch_69bd6dfff1488190a32bbb615bfab970 completed March 20, 2026, 3:55 p.m.
Created at: March 20, 2026, 1:25 p.m.