Triple
T4844091
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Les Espaces d'Abraxas |
E108247
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | postmodern architectural work |
C8065
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: postmodern architectural work Context triple: [Les Espaces d'Abraxas, instanceOf, postmodern architectural work]
-
A.
postmodern architecture
chosen
Postmodern architecture is a design movement that emerged in the late 20th century, characterized by eclectic forms, playful references to historical styles, and a rejection of the strict functionalism and minimalism of modernism.
-
B.
modernist architectural work
A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
-
C.
modernist architecture work
A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
-
D.
contemporary architecture
Contemporary architecture is a style of building design characterized by innovative forms, advanced materials and technologies, sustainable practices, and an emphasis on functionality and integration with the surrounding environment.
-
E.
architectural work
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd4409b264819085ab855f3eb5381a |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:25 p.m.