Triple
T4832833
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Landings |
E107983
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned subdivision |
C5974
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned subdivision Context triple: [The Landings, instanceOf, planned subdivision]
-
A.
planned residential community
chosen
A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
D.
town plan
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
E.
partition plan
A partition plan is a detailed layout or strategy that defines how a space, dataset, or resource is divided into distinct sections or segments according to specific criteria or requirements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43fbe444819085cb970706ef73f7 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:24 p.m.