Triple
T4832759
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Potomac River crossings toward Washington, D.C. |
E107981
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation infrastructure grouping |
C2822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation infrastructure grouping Context triple: [Potomac River crossings toward Washington, D.C., instanceOf, transportation infrastructure grouping]
-
A.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
B.
transportation corridors collection
chosen
A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
E.
transportation organization
A transportation organization is an entity that plans, manages, and operates systems or services that move people or goods from one location to another.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43fbe444819085cb970706ef73f7 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:24 p.m.