Triple
T4825937
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Danbi Bridge |
E107824
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ceremonial walkway |
C530
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ceremonial walkway Context triple: [Danbi Bridge, instanceOf, ceremonial walkway]
-
A.
ceremonial corridor
A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
-
B.
ceremonial road
A ceremonial road is a specially designated route used for formal processions, rituals, or state occasions, often designed to emphasize symbolic, cultural, or political significance.
-
C.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
D.
ceremonial bridge
chosen
A ceremonial bridge is a specially designed structure used primarily for symbolic, ritual, or commemorative crossings during formal events rather than for everyday transportation.
-
E.
elevated walkway
An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43fac8188190803f0327190621e4 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:24 p.m.