Triple

T4802391
Position Surface form Disambiguated ID Type / Status
Subject Adamawa Plateau E106864 entity
Predicate drainageDivideBetween P6497 FINISHED
Object Logone River basin E151448 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Logone River basin | Statement: [Adamawa Plateau, drainageDivideBetween, Logone River basin]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Logone River basin
Context triple: [Adamawa Plateau, drainageDivideBetween, Logone River basin]
  • A. Logone River chosen
    The Logone River is a significant Central African waterway that forms part of the border between Chad and Cameroon before joining the Chari River near Lake Chad.
  • B. Gongola River
    The Gongola River is a major river in northeastern Nigeria that flows through the savanna region before joining the Benue River.
  • C. Ubangi-Shari
    Ubangi-Shari was the French colonial territory in central Africa that later became the independent nation of the Central African Republic.
  • D. Ubangi River
    The Ubangi River is a major Central African waterway that forms part of the border between the Democratic Republic of the Congo and the Central African Republic before joining the Congo River.
  • E. Sanaga River
    The Sanaga River is the longest river in Cameroon, flowing from the central highlands to the Atlantic Ocean and serving as a major source of hydroelectric power and water resources for the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f6a1e08190bf0a372bfc336ee5 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6c42113081908824f3608e65cbff completed March 20, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69be4d9e1ea88190b098d5203bd1d145 completed March 21, 2026, 7:49 a.m.
Created at: March 20, 2026, 1:23 p.m.