Triple
T4798920
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tulor archaeological site |
E106784
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | village complex |
C16386
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: village complex Context triple: [Tulor archaeological site, instanceOf, village complex]
-
A.
village center
A village center is the focal area of a rural community where key social, commercial, and civic activities are concentrated, often including shops, public spaces, and community facilities.
-
B.
village-like settlement
A village-like settlement is a small, closely-knit residential community with limited infrastructure, where inhabitants live in close proximity and often share local resources, traditions, and social ties.
-
C.
mesa-top village
A mesa-top village is a small, often isolated settlement built on the flat summit of a mesa, taking advantage of its elevated, defensible, and panoramic terrain.
-
D.
tourist village
A tourist village is a small, purposefully developed settlement or area designed to accommodate and entertain visitors with lodging, amenities, and local cultural or recreational attractions.
-
E.
model village
A model village is a small-scale, detailed physical representation of a village, often created for display, educational, or planning purposes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43f6a1e08190bf0a372bfc336ee5 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:22 p.m.