Triple

T4795480
Position Surface form Disambiguated ID Type / Status
Subject Alabama State Route 3 E106700 entity
Predicate abbreviation P43 FINISHED
Object SR 3
SR 3 is the internal designation for a major north–south state highway corridor in Alabama that largely follows the route of U.S. Route 31.
E470467 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 3 | Statement: [Alabama State Route 3, abbreviation, SR 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 3
Context triple: [Alabama State Route 3, abbreviation, SR 3]
  • A. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • B. SR 2
    SR 2 is a state highway in the Florida Panhandle that runs near the Alabama border, serving as an east–west route through rural communities.
  • C. SR 13
    SR 13 is a north–south state highway in Ohio that runs between the city of Mansfield and the village of Huron, passing through several counties in the north-central part of the state.
  • D. SR 354
    SR 354 is a state highway in Georgia that serves as a connector route in the western part of the state, providing access to local communities and regional roads.
  • E. SR 1
    SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 3
Triple: [Alabama State Route 3, abbreviation, SR 3]
Generated description
SR 3 is the internal designation for a major north–south state highway corridor in Alabama that largely follows the route of U.S. Route 31.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 3
Target entity description: SR 3 is the internal designation for a major north–south state highway corridor in Alabama that largely follows the route of U.S. Route 31.
  • A. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • B. SR 2
    SR 2 is a state highway in the Florida Panhandle that runs near the Alabama border, serving as an east–west route through rural communities.
  • C. SR 13
    SR 13 is a north–south state highway in Ohio that runs between the city of Mansfield and the village of Huron, passing through several counties in the north-central part of the state.
  • D. SR 354
    SR 354 is a state highway in Georgia that serves as a connector route in the western part of the state, providing access to local communities and regional roads.
  • E. SR 1
    SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f591c881909e5a532388b0f3f3 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6609e9888190b49f99bb9fb2279d completed March 20, 2026, 3:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69be43f512e0819086cc33009cd45c9a completed March 21, 2026, 7:08 a.m.
NEDg Description generation batch_69be44cb99ac819089bbb941709a93c4 completed March 21, 2026, 7:12 a.m.
NED2 Entity disambiguation (via description) batch_69be451e8d7c81908d856e7966daa5fe completed March 21, 2026, 7:13 a.m.
Created at: March 20, 2026, 1:22 p.m.