Triple

T4766536
Position Surface form Disambiguated ID Type / Status
Subject Income Doubling Plan E105825 entity
Predicate instanceOf P0 FINISHED
Object government economic plan C3762 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: government economic plan
Context triple: [Income Doubling Plan, instanceOf, government economic plan]
  • A. government budget
    A government budget is a financial plan that outlines a government's projected revenues and expenditures over a specific period, typically one fiscal year, to achieve its economic and policy objectives.
  • B. economic policy
    Economic policy is a set of government decisions and actions designed to influence a nation's economic performance, including growth, employment, inflation, and income distribution.
  • C. fiscal policy program chosen
    A fiscal policy program is a coordinated set of government actions and rules that use taxation, spending, and borrowing to influence economic activity, growth, and stability.
  • D. national economy
    A national economy is the system of production, distribution, and consumption of goods and services within a country, shaped by its resources, institutions, policies, and interactions with the global market.
  • E. economic aid program
    An economic aid program is an organized initiative, typically funded by governments or international institutions, designed to provide financial resources, technical assistance, or policy support to stimulate economic development, stabilize economies, or alleviate poverty in targeted regions or populations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f226fc8190b867cc249c2a9042 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:21 p.m.