Triple
T4764086
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ORISE |
E105765
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. Department of Energy institute |
C11708
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. Department of Energy institute Context triple: [ORISE, instanceOf, U.S. Department of Energy institute]
-
A.
Argonne National Laboratory facility
An Argonne National Laboratory facility is a specialized research site, building, or infrastructure component operated or managed by Argonne National Laboratory to support its scientific, engineering, and technological missions.
-
B.
U.S. Department of Energy field office
A U.S. Department of Energy field office is a regional operational unit that oversees, manages, and implements DOE programs, projects, and facilities within a specific geographic area.
-
C.
joint institute
chosen
A joint institute is an educational or research organization formed through a formal partnership between two or more institutions, typically across regions or countries, to collaboratively share resources, expertise, and programs.
-
D.
National Science Foundation facility
A National Science Foundation facility is a research infrastructure, laboratory, observatory, or center funded or supported by the NSF to enable and advance scientific discovery and education across diverse disciplines.
-
E.
United States Department of Energy contractor
A United States Department of Energy contractor is an external organization or company that enters into a formal agreement with the DOE to provide specialized services, research, operations, or support for the nation’s energy, environmental, and nuclear security missions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43f14cac819081c7c69803648211 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:21 p.m.