Triple

T4753954
Position Surface form Disambiguated ID Type / Status
Subject Karcham Wangtoo Dam E105541 entity
Predicate partOf P40 FINISHED
Object Sutlej River hydroelectric projects
The Sutlej River hydroelectric projects are a series of major dams and power stations along the Sutlej River in India designed to generate electricity and support regional development.
E467560 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sutlej River hydroelectric projects | Statement: [Karcham Wangtoo Dam, partOf, Sutlej River hydroelectric projects]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sutlej River hydroelectric projects
Context triple: [Karcham Wangtoo Dam, partOf, Sutlej River hydroelectric projects]
  • A. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • D. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • E. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sutlej River hydroelectric projects
Triple: [Karcham Wangtoo Dam, partOf, Sutlej River hydroelectric projects]
Generated description
The Sutlej River hydroelectric projects are a series of major dams and power stations along the Sutlej River in India designed to generate electricity and support regional development.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sutlej River hydroelectric projects
Target entity description: The Sutlej River hydroelectric projects are a series of major dams and power stations along the Sutlej River in India designed to generate electricity and support regional development.
  • A. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • D. Ujh Multipurpose Project
    The Ujh Multipurpose Project is a planned Indian infrastructure scheme aimed at harnessing the waters of the Ujh River for irrigation, drinking water supply, and hydroelectric power generation.
  • E. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43f07fa48190954317d01600994a completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd64e72d1c81908eb60960751e52b1 completed March 20, 2026, 3:16 p.m.
NED1 Entity disambiguation (via context triple) batch_69be3a6600e481909c3fb1decf23d7d8 completed March 21, 2026, 6:27 a.m.
NEDg Description generation batch_69be3d05e8a081908cdcb37620078fa6 completed March 21, 2026, 6:39 a.m.
NED2 Entity disambiguation (via description) batch_69be3daa7e0081908971df65613c9df6 completed March 21, 2026, 6:41 a.m.
Created at: March 20, 2026, 1:20 p.m.