Triple

T4744509
Position Surface form Disambiguated ID Type / Status
Subject Arizona Sun Corridor E105326 entity
Predicate traversedBy P225 FINISHED
Object Interstate 17 E319202 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 17 | Statement: [Arizona Sun Corridor, traversedBy, Interstate 17]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 17
Context triple: [Arizona Sun Corridor, traversedBy, Interstate 17]
  • A. Interstate 17 chosen
    Interstate 17 is a primary north–south freeway in Arizona that connects Phoenix with Flagstaff and serves as a key route to northern Arizona destinations.
  • B. Interstate 19
    Interstate 19 is a short U.S. Interstate Highway in southern Arizona that uniquely uses metric distance signs and connects Tucson to the U.S.–Mexico border at Nogales.
  • C. Interstate 25
    Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
  • D. Interstate 172
    Interstate 172 is a short auxiliary Interstate Highway in western Illinois that connects Quincy to Interstate 72, serving as a spur route to the main corridor.
  • E. Interstate 15
    Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ef87a48190a5bc3600711aa032 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd64aa72c0819082ede0f531d75e65 completed March 20, 2026, 3:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69bfd2366a3c819097391ad8731c21a8 completed March 22, 2026, 11:27 a.m.
Created at: March 20, 2026, 1:19 p.m.