Triple

T4744508
Position Surface form Disambiguated ID Type / Status
Subject Arizona Sun Corridor E105326 entity
Predicate traversedBy P225 FINISHED
Object Interstate 8 E152509 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 8 | Statement: [Arizona Sun Corridor, traversedBy, Interstate 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 8
Context triple: [Arizona Sun Corridor, traversedBy, Interstate 8]
  • A. Interstate 8 chosen
    Interstate 8 is a major east–west U.S. Interstate Highway running from San Diego, California, to the Arizona border near Yuma, serving as a key route across the southernmost part of the Southwest.
  • B. Interstate 82
    Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
  • C. Interstate 190
    Interstate 190 is a short auxiliary Interstate Highway in Illinois that connects the Kennedy Expressway to Chicago’s O’Hare International Airport.
  • D. Interstate 190
    Interstate 190 is a major auxiliary Interstate Highway in western New York that connects Buffalo to Niagara Falls and the Canadian border.
  • E. Interstate 2
    Interstate 2 is a short east–west U.S. Interstate Highway in far south Texas that connects the Rio Grande Valley cities near the Mexican border and links to major regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ef87a48190a5bc3600711aa032 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd64aa72c0819082ede0f531d75e65 completed March 20, 2026, 3:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69c89a4282ac8190aa641d466763b786 completed March 29, 2026, 3:19 a.m.
Created at: March 20, 2026, 1:19 p.m.