Triple

T4738425
Position Surface form Disambiguated ID Type / Status
Subject Cabinet Mission negotiations E105180 entity
Predicate instanceOf P0 FINISHED
Object event in 1946 C16282 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: event in 1946
Context triple: [Cabinet Mission negotiations, instanceOf, event in 1946]
  • A. event in 1955
    An event in 1955 is any significant occurrence, action, or happening that took place during the calendar year 1955 and holds historical, cultural, social, political, or personal relevance.
  • B. World War II conference
    A World War II conference is a high-level diplomatic meeting held among Allied or Axis leaders during the war to coordinate military strategy, negotiate political arrangements, and shape postwar plans.
  • C. Berlin Airlift
    The Berlin Airlift was a massive Allied operation from 1948 to 1949 in which Western powers supplied West Berlin entirely by air after the Soviet Union blockaded all ground routes into the city.
  • D. event in Myanmar history
    An event in Myanmar history is a significant occurrence or development within Myanmar’s past that has shaped its political, social, cultural, or economic trajectory.
  • E. event in Nazi Germany
    An event in Nazi Germany is a historically situated occurrence—political, social, military, cultural, or economic—that took place under the National Socialist regime between 1933 and 1945 and contributed to its policies, ideology, or consequences.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ef87a48190a5bc3600711aa032 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:19 p.m.