Triple

T4731618
Position Surface form Disambiguated ID Type / Status
Subject Patuxent River E105020 entity
Predicate conservationEffort P10937 FINISHED
Object Patuxent River Policy Plan
The Patuxent River Policy Plan is a coordinated environmental management strategy designed to protect, restore, and sustainably manage the Patuxent River and its surrounding watershed.
E464667 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Patuxent River Policy Plan | Statement: [Patuxent River, conservationEffort, Patuxent River Policy Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Patuxent River Policy Plan
Context triple: [Patuxent River, conservationEffort, Patuxent River Policy Plan]
  • A. Presidential Policy Directive 21
    Presidential Policy Directive 21 is a U.S. directive that establishes national policy for strengthening the security and resilience of critical infrastructure against physical and cyber threats.
  • B. McMillan Plan
    The McMillan Plan was an early 20th-century urban design blueprint that reshaped Washington, D.C.’s monumental core with grand boulevards, parks, and neoclassical civic spaces inspired by City Beautiful principles.
  • C. Master Plan for the Central Delaware
    Master Plan for the Central Delaware is a long-term urban design and development framework guiding the revitalization of Philadelphia’s central Delaware River waterfront into a more accessible, mixed-use, and publicly oriented corridor.
  • D. Fort Meade, Maryland
    Fort Meade, Maryland is a major U.S. Army installation best known as the primary center for American military intelligence and cybersecurity operations.
  • E. Base Realignment and Closure 2005
    Base Realignment and Closure 2005 was a major U.S. Department of Defense initiative that restructured military installations nationwide by closing, consolidating, and realigning bases to increase efficiency and reduce costs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Patuxent River Policy Plan
Triple: [Patuxent River, conservationEffort, Patuxent River Policy Plan]
Generated description
The Patuxent River Policy Plan is a coordinated environmental management strategy designed to protect, restore, and sustainably manage the Patuxent River and its surrounding watershed.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Patuxent River Policy Plan
Target entity description: The Patuxent River Policy Plan is a coordinated environmental management strategy designed to protect, restore, and sustainably manage the Patuxent River and its surrounding watershed.
  • A. Presidential Policy Directive 21
    Presidential Policy Directive 21 is a U.S. directive that establishes national policy for strengthening the security and resilience of critical infrastructure against physical and cyber threats.
  • B. McMillan Plan
    The McMillan Plan was an early 20th-century urban design blueprint that reshaped Washington, D.C.’s monumental core with grand boulevards, parks, and neoclassical civic spaces inspired by City Beautiful principles.
  • C. Master Plan for the Central Delaware
    Master Plan for the Central Delaware is a long-term urban design and development framework guiding the revitalization of Philadelphia’s central Delaware River waterfront into a more accessible, mixed-use, and publicly oriented corridor.
  • D. Fort Meade, Maryland
    Fort Meade, Maryland is a major U.S. Army installation best known as the primary center for American military intelligence and cybersecurity operations.
  • E. Base Realignment and Closure 2005
    Base Realignment and Closure 2005 was a major U.S. Department of Defense initiative that restructured military installations nationwide by closing, consolidating, and realigning bases to increase efficiency and reduce costs.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ee52048190b81a4f066534ffb3 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd64647c788190b7aa908c42ac11cf completed March 20, 2026, 3:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69be10a9386c81908557fe4feb190e8a completed March 21, 2026, 3:29 a.m.
NEDg Description generation batch_69be150ee8c8819083bd769ae8522418 completed March 21, 2026, 3:48 a.m.
NED2 Entity disambiguation (via description) batch_69be158121d08190a50c8d405264839b completed March 21, 2026, 3:50 a.m.
Created at: March 20, 2026, 1:19 p.m.