Triple
T4725813
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sèvres |
E104880
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | porcelain-manufacturing center |
C8405
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: porcelain-manufacturing center Context triple: [Sèvres, instanceOf, porcelain-manufacturing center]
-
A.
industrial center
chosen
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
-
B.
ceramicist
A ceramicist is a skilled artisan who designs, shapes, and fires clay into functional or artistic ceramic objects using various tools, techniques, and glazes.
-
C.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
D.
tin-glazed earthenware
Tin-glazed earthenware is a type of pottery coated with an opaque white glaze made by adding tin oxide, often decorated with colorful painted designs.
-
E.
decorative arts firm
A decorative arts firm is a business that designs, produces, and/or curates aesthetically focused objects and interior elements—such as furnishings, textiles, lighting, and ornamental pieces—to enhance the visual and cultural appeal of spaces.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43ed84648190ae0b7ee8e8d00482 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:18 p.m.