Triple

T4725813
Position Surface form Disambiguated ID Type / Status
Subject Sèvres E104880 entity
Predicate instanceOf P0 FINISHED
Object porcelain-manufacturing center C8405 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: porcelain-manufacturing center
Context triple: [Sèvres, instanceOf, porcelain-manufacturing center]
  • A. industrial center chosen
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • B. ceramicist
    A ceramicist is a skilled artisan who designs, shapes, and fires clay into functional or artistic ceramic objects using various tools, techniques, and glazes.
  • C. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • D. tin-glazed earthenware
    Tin-glazed earthenware is a type of pottery coated with an opaque white glaze made by adding tin oxide, often decorated with colorful painted designs.
  • E. decorative arts firm
    A decorative arts firm is a business that designs, produces, and/or curates aesthetically focused objects and interior elements—such as furnishings, textiles, lighting, and ornamental pieces—to enhance the visual and cultural appeal of spaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ed84648190ae0b7ee8e8d00482 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:18 p.m.