Triple

T4723913
Position Surface form Disambiguated ID Type / Status
Subject North Side Main Line E104833 entity
Predicate instanceOf P0 FINISHED
Object historic transportation infrastructure C3667 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: historic transportation infrastructure
Context triple: [North Side Main Line, instanceOf, historic transportation infrastructure]
  • A. historic transportation system
    A historic transportation system is an organized network of vehicles, routes, and infrastructure from a past era that once facilitated the movement of people or goods and is now preserved, studied, or remembered for its cultural, technological, or historical significance.
  • B. historic infrastructure chosen
    Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
  • C. historic road
    A historic road is a transportation route of significant age and cultural, economic, or political importance, preserved or recognized for its role in shaping historical events, trade, or settlement patterns.
  • D. historic institution
    A historic institution is an established organization or structure that has played a significant, enduring role in society over time and is recognized for its cultural, political, or social legacy.
  • E. historic industrial structure
    A historic industrial structure is a preserved building or facility originally designed for manufacturing, processing, or other industrial activities, valued today for its architectural, technological, and cultural significance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43ed84648190ae0b7ee8e8d00482 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:18 p.m.