Triple

T4709496
Position Surface form Disambiguated ID Type / Status
Subject Pier 21 E104473 entity
Predicate instanceOf P0 FINISHED
Object former ocean liner terminal C16030 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former ocean liner terminal
Context triple: [Pier 21, instanceOf, former ocean liner terminal]
  • A. former port facility chosen
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • B. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • C. former naval base
    A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
  • D. former port city
    A former port city is an urban settlement that once functioned as a significant maritime trade hub but has since lost its port operations or primary seafaring role due to economic, environmental, or infrastructural changes.
  • E. ocean liner
    An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43eac3c08190af7e4020c6c3704c completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:17 p.m.