Triple

T4703960
Position Surface form Disambiguated ID Type / Status
Subject L Reactor E104343 entity
Predicate neighboringReactor P58637 FINISHED
Object P Reactor E100463 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: P Reactor | Statement: [L Reactor, neighboringReactor, P Reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: P Reactor
Context triple: [L Reactor, neighboringReactor, P Reactor]
  • A. P Reactor chosen
    P Reactor was a plutonium and tritium production nuclear reactor at the U.S. Department of Energy’s Savannah River Site in South Carolina, built during the Cold War to support the nation’s nuclear weapons program.
  • B. L Reactor
    L Reactor was a heavy water–moderated nuclear production reactor at the Savannah River Site in South Carolina, historically used to produce materials such as plutonium and tritium for the U.S. nuclear weapons program.
  • C. R Reactor
    R Reactor was one of the plutonium and tritium production nuclear reactors that operated at the U.S. Department of Energy’s Savannah River Site during the Cold War.
  • D. H Reactor
    H Reactor was one of the plutonium-producing nuclear reactors at the Hanford Site in Washington, built during the Cold War as part of the U.S. nuclear weapons program.
  • E. B Reactor
    B Reactor is the world’s first full-scale plutonium production reactor, built during the Manhattan Project at the Hanford Site in Washington State.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43e9b88481908582103dcadff3d9 completed March 20, 2026, 12:56 p.m.
NER Named-entity recognition batch_69bd6c3d1cb88190a42919dcbfe2568c completed March 20, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69be4d7ad90c8190b6f36472a209a0f9 completed March 21, 2026, 7:49 a.m.
Created at: March 20, 2026, 1:17 p.m.