Triple

T4703266
Position Surface form Disambiguated ID Type / Status
Subject Bell X-1C E104326 entity
Predicate instanceOf P0 FINISHED
Object unbuilt aircraft project C16232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unbuilt aircraft project
Context triple: [Bell X-1C, instanceOf, unbuilt aircraft project]
  • A. experimental aircraft
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • C. prototype rocket
    A prototype rocket is an experimental launch vehicle built to test and validate new propulsion, structural, and control technologies before full-scale production or operational deployment.
  • D. experimental aircraft program series
    A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
  • E. pilotless aircraft
    A pilotless aircraft is an unmanned aerial vehicle that operates without an onboard human pilot, controlled either remotely or autonomously via onboard systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43e9b88481908582103dcadff3d9 completed March 20, 2026, 12:56 p.m.
Created at: March 20, 2026, 1:17 p.m.