Triple
T4702097
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Riazuddin |
E104297
|
entity |
| Predicate | workInstitution |
P1203
|
FINISHED |
| Object | Pakistan Atomic Energy Commission |
E94921
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pakistan Atomic Energy Commission | Statement: [Riazuddin, workInstitution, Pakistan Atomic Energy Commission]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pakistan Atomic Energy Commission Context triple: [Riazuddin, workInstitution, Pakistan Atomic Energy Commission]
-
A.
Pakistan Nuclear Regulatory Authority
The Pakistan Nuclear Regulatory Authority is the national body responsible for regulating nuclear safety, security, and radiation protection in Pakistan.
-
B.
Khushab nuclear complex
The Khushab nuclear complex is a key Pakistani nuclear facility believed to produce weapons-grade plutonium for the country’s nuclear arsenal.
-
C.
SAARC Energy Centre
The SAARC Energy Centre is a specialized regional institution that promotes energy cooperation, policy coordination, and sustainable energy development among the member states of the South Asian Association for Regional Cooperation.
-
D.
Pakistan Atomic Energy Commission (advisory role)
chosen
The Pakistan Atomic Energy Commission (advisory role) is a governmental scientific body that guides and oversees Pakistan’s nuclear science, technology, and energy programs at the policy and research level.
-
E.
Pakistan Space and Upper Atmosphere Research Commission
The Pakistan Space and Upper Atmosphere Research Commission (SUPARCO) is Pakistan’s national space agency, responsible for the country’s space research, satellite development, and related scientific and technological programs.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43e9b88481908582103dcadff3d9 |
completed | March 20, 2026, 12:56 p.m. |
| NER | Named-entity recognition | batch_69bd63cec7988190b5f1d04d4f95314a |
completed | March 20, 2026, 3:12 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69be03cd8cd4819081a7988b5945067f |
completed | March 21, 2026, 2:34 a.m. |
Created at: March 20, 2026, 1:17 p.m.