Triple
T4701932
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dubai Creek extension corridor |
E104293
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure corridor |
C2218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure corridor Context triple: [Dubai Creek extension corridor, instanceOf, infrastructure corridor]
-
A.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
B.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
C.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
D.
development corridor
chosen
A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
-
E.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43e9b88481908582103dcadff3d9 |
completed | March 20, 2026, 12:56 p.m. |
Created at: March 20, 2026, 1:17 p.m.