Triple

T4683566
Position Surface form Disambiguated ID Type / Status
Subject La Plata Basin E103861 entity
Predicate hydropowerPlant P15311 FINISHED
Object Salto Grande Dam E186083 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Salto Grande Dam | Statement: [La Plata Basin, hydropowerPlant, Salto Grande Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Salto Grande Dam
Context triple: [La Plata Basin, hydropowerPlant, Salto Grande Dam]
  • A. Salto Grande Dam chosen
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • B. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • C. Itaipu Dam
    Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
  • D. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • E. Foz do Chapecó Dam
    Foz do Chapecó Dam is a hydroelectric power plant and dam complex located on the Uruguay River in southern Brazil, known for its significant contribution to regional electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd43debbf08190b4bc372e286ec234 completed March 20, 2026, 12:55 p.m.
NER Named-entity recognition batch_69bd638130a08190876c5829c0488758 completed March 20, 2026, 3:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69be39ca8f6081909aecde545f211bb9 completed March 21, 2026, 6:25 a.m.
Created at: March 20, 2026, 1:16 p.m.