Triple
T4672578
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Big River Grille & Brewing Works |
E103598
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | microbrewery |
C8033
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: microbrewery Context triple: [Big River Grille & Brewing Works, instanceOf, microbrewery]
-
A.
brewery
chosen
A brewery is a facility where beer is produced through the processes of mashing, fermenting, conditioning, and packaging, often combining industrial equipment with craft-based techniques.
-
B.
brewery complex
A brewery complex is a coordinated group of buildings and facilities where beer is produced, stored, packaged, and often served to the public, typically including brewing equipment, warehouses, administrative areas, and visitor spaces.
-
C.
brewer
A brewer is a person or entity that specializes in creating beer or other fermented beverages through controlled brewing processes.
-
D.
drinking establishment
A drinking establishment is a venue where alcoholic beverages are prepared, sold, and consumed, often providing seating, social interaction, and sometimes entertainment or food.
-
E.
winery
A winery is a facility or business where wine is produced, often including vineyards for growing grapes, equipment for fermentation and aging, and spaces for tasting and sales.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69bd43dda32c8190938b37744ca270fc |
completed | March 20, 2026, 12:55 p.m. |
Created at: March 20, 2026, 1:15 p.m.